BANK QS SERVICES, COMPLETED 2017, RESIDENTIAL

Development at 25-31 Terminus Street comprises 21 residential units (stages 2 and 3) made up of 11, one or two unit blocks. Construction comprises timber wall and roof framing. The external envelopes are made up of clay brick cladding, double glazed aluminium joinery and metal tile roofing. Internal partitions are timber-framed with inter-tenancy firewalls between units. All units comprise two to three bedrooms and an attached garage. Externally, a concrete driveway is provided to each garage from the cul-de-sac roading off Terminus Street.

ECS involvement began with stage 2 of the development.

 

Total Value: $5.6 million

ECS Services: Bank QS Services

Completion Date: 2017

Project Duration: Stage 2 – 9 months, Stage 3 – 7 months

Client: Onward Development Group

Main Contractor: The works are being administered and managed by Onward Development Group together with GeoMetrix Ltd

Architect: GeoMetrix Ltd

Others: Tonkin & Taylor (geotechnical engineer)